Grand County Courthouse boiler room RFP
Grand County is seeking proposals to troubleshoot, repair, and update the hot water system in the boiler room for the grand county courthouse and jail.
Replace the older of the two water heaters and bring both into compliance with the plumbing code. Fix leaks in the main water line. Identify and fix problems with recirculated tempered water not reaching all areas.
Bidders must schedule a pre-bid meeting by contacting Shawn Fugit, Facilities Supervisor
at 435-259-1314, .
Proposals must included
1. Update/Repair the mixing wall to provide correct control of recirculated
tempered or hot water throughout the detention center and courthouse- including
all areas in the jail
2. Repair and or replace main water line
3. Replace the older of two hot water heaters; including seismic strapping
4. Miscellaneous items that come up in the pre bid meeting.
5. Provide a plan to maintain safe and sanitary working conditions for the
courthouse and detention center during the work or installation.
6. Provide 2 year warranty on labor and 10 year on products
7. Obtain all building permits required to complete job
8. Provide an as built mechanical drawing